1956 220a Mercedes engine restoration

 

 

 

 

 

The Cylinder Head has been stripped,wetblasted ,checked for porosity and hardness tested . New valve guides are fitted with new valve guide seals. The heater and thermometer fittings have to installed but that can wait until  I  have it fitted up to the engine block. 

workshop5 001workshop5 002workshop5 005workshop5 006

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s