300SE Lang Rust repair continued Pt 3

IMG_0110

The first step towards actually painting ,a coat of etch primer on the bare steel

IMG_0111

The doors and one front mudguard have been fitted in preparation for the primer coats of paint

IMG_0093 (3)

New Left Front guard fitted up, this is now Etch primed prior to priming which takes place towards the end of this week. The holes for the trim have to drilled too.

At Long last the 1st primer coats are on and the guide coat applied, to aid in the 1st stges of block sanding.

img_0105

img_0104

 

Leave a comment